Saturday, December 1, 2007

Saturday Review

We got out today in the cloudy daylight to survey the site. The first photo Leslie took from the upstairs sunporch, so that you would get a bird's eye view, and especially see the space to the right, which will become a patio area.

In the next photo is the same area seen from ground level. The fence has been taken down up to the right edge of the green garage apartment. In effect, we have no backyard fence now. Here is a view of the downstairs sunporch from one corner of the garage pad. There will be a deck built from the sunporch door out beyond the pillar, with steps down to the yard. This means that the current concrete steps and steel railing will be gone. Storage is planned for under the landing at the door.
Monday morning the team comes back to lay the new sidewalk out front. We are pleased so far with how much has been done in just one week's time. Monday they will also start the framing on the garage.

Friday, November 30, 2007

Day 4 1/2

We thought that Friday would be an off day for the workers, but they began before 7:00, when the concrete trucks arrived. Jeff told us they wanted to lay the pad for the garage today to give it time to cure. With the leftover they extended the footing for one side of the original driveway and poured a footing for the front retaining wall, as the photos show.


By the way, today's work was overtime for the boys, so I am sure they welcomed it.

This was one busy week for the crews. We had no idea they would be this far along at the end of the first week.


Monday they pour the front sidewalk.




Thursday, November 29, 2007

Day 4

Looks like they did a lot today. Exciting! Here's some photos.




Wednesday, November 28, 2007

Day 3: Major Changes

Well, Day 3 is over now. It began this morning at about 6:05, long before sunup, when the crew arrived and revved up the diesel engines and started moving earth. When those machines back up, of course the warning signal goes off, so between the diesel engines and warning signals, and the high-intensity lights, I don't know how our neighbors in the five apartments were able to sleep. I got home about 4:45 in time to take some photos in the fading daylight. It was overcast anyway, so it was darker than it would normally be. Here are some photos:

A rectangle trench was dug in the backyard and the footings were poured for the foundation and retaining walls. The concrete was still wet and water was standing on it.

In the second photo, taken from the alley, you can see part of the footing, but you can also see the spray paint that marks the phone cable. AT&T came by today to repair the cable, but for now it lies on top of the ground, and it makes an end around the garage so that it won't be covered up by the concrete pad that will be poured.

The next one shows the splice in the alley, where the new cable is spliced onto the cable that comes up from the ground in the alley. The ground had worn away over the years until the phone cable was exposed.


The next photo shows the footings for the new retaining walls on each side of the original driveway:


A final picture--here is a shot of the equipment parked in the yard on the Glenview side, with a big pile of excavated dirt:


The forms out front look set, so I think that Thursday the front sidewalk will be poured. I bet there will be enough changes to post to this blog tomorrow.