Monday, December 10, 2007

The Iceman Cometh

We had thunder, lightning, and freezing rain most of the night Saturday, so awoke to a mess on Sunday. No church services because there was no power there. My mom called a little before 8:00 to tell us she had no power but planned to wait it out to see if it came back. We were enjoying our hot coffee/tea, hot oat bran, and the Sunday paper. But before we finished, our electricity went out, too. We toughed it out most of the day. Stayed warm by doing chores around the house. As it began to get dark (and colder), Dale dropped me off at the Post Library and went to get Mama. She was needing electricity to use her nebulizer. We hung out in the Post Library for a few hours-- cooked supper, watched t.v. She wanted to go back home to spend the night, so Dale took her there. He went to Walmart to buy an air mattress (we discovered the one we brought didn't hold air), so we slept here at the Post Library over night.



This morning we were going to go shower at the Y, but didn't wake up until 8, so there wasn't enough time. I'm looking and feeling pretty skanky without my shower. Meanwhile, Dale had an emergency to attend to at Mama's house. Yesterday she had lots of big limbs down. One tore the power lines from her house, so they're lying in the yard. Another took down her phone line. But the most urgent situation was caused by a limb that came down on the roof, tore off the turbine vent, and left a gaping hole. Dale went off to get someone to secure the roof (actually, some of the workers from the job site at our house, so that worked out well). He also took some photos since we'll have to file with the insurance co. Looks like she won't have power there for some time. I guess we'll probably be camping out all week at Post. With another 24 hours or so of freezing rain, the prognosis looks pretty grim.

Dale just reported that the guys covered over the roof hole with roofing and boards, so at least it's keeping rain out. They also cut some of the limbs that were hanging low over the house.



Here's some photos. The really nasty-looking one of the trunk split into 3 sections is actually in her neighbor's yard (to the east). A good portion of the tree is now lying in her yard.









Friday, December 7, 2007

End of Week 2

Omigoodness! What a week. The guys worked 40+ hours Mon.-Thurs. so they're taking the day off. So that gave me (Leslie) my first opportunity to take photos during daylight without getting in their way. (It's very muddy out there, so now I have to clean mud off my shoes.) Things are looking good, overall. We had a bit of a crisis to deal with on Wed. night, when Jeff called to tell us that Lowe's (yes, good ol' Screw-It-Up Lowe's) had messed up our materials order. Jeff had ordered a certain kind of the cement panels for the exterior walls of the garage, but Lowe's gave them the wrong ones. The work crew didn't know what had been ordered, so they just installed what they were given. Jeff stopped by to take a look at the progress and was horrified to see that it was NOT what we'd ordered. He sheepishly called us Wed. night to tell us the bad news and ask what we wanted to do. Since I was in the throes (literally) of preparing for a colonoscopy early Thurs. morning, it was NOT a good time to deal with it. We went out and looked at it with a flashlight. I didn't like it, but decided that since it's going to be hidden with trellises on the 2 sides that are visible, then it's not worth making them do it over. Obviously Lowe's wouldn't take it back anyway, since it had been cut and nailed up. The other 2 sides face the alley and the garage apartment, so I guess it doesn't matter. Jeff said he'd see if Lowe's would discount the materials any, and he would credit us for some labor and materials that were not used as a result of the screw up. (We had planned to do a board-and-batten design, which would have taken used more wood and labor). The front sidewalk is finished and is quite nice. Here are some photos.


The first one shows the garage as seen from the pond area. The side opening is where they'll put the original door from the basement garage.

As you can see, the flat roof slants to the alley. Once the pergola and trellis go up on this side, you won't be able to tell that it slants. You can get some idea of the incline of the new driveway. On either side are the footings for the new retaining walls that will be on either side of the driveway.

More footings for retaining walls


A view from the 2nd floor sunporch showing the partial roofing job.




Wednesday, December 5, 2007

Wed. p.s.

Dale didn't mention that I racked up some brownie points yesterday....literally. I baked a batch of brownies before I went to work and took them out to the work crew while they (the brownies) were still warm and gooey. So maybe that's why the sidewalk guy was willing to work over 13 hours for us yesterday. There had better not be cat tracks in our lovely new sidewalk. There's been a gray cat hanging around all day and night the last few weeks. In fact, I told one of the guys (who had a sledgehammer in his hand at the time), that if he had a little accident involving the sledgehammer and that cat, it would be our little secret.

Week 2, Days 1 & 2

This is just a quick update, prior to posting pictures. Monday's work included erecting the framework of the garage, doing more excavating work, and grading. Since there were still some men around the site around 5:00, we didn't get photos.

Yesterday (Tuesday) there was more work on the framing, but the big deal was more concrete work. Footings were dug and concrete was put down around the new driveway, for the retaining walls. Out front the new sidewalk was laid. When I got home about 5:55 (I worked late), two men were still out there, using their truck headlight to smooth the surface. I turned on the porchlight, which helped them. When I went back out about 7:00, one of the men was still there, smoothing out the steps. He told me he had 12 years of experience in Kansas City as a union concrete man and that we should be proud of the results. One thing, though: the railing that was out there, when pulled up, broke at the base, as it was corroded. At least for some time there will be no railing out there.

Our man worked well past 7:00 before he went home. What a long day, beginning at 6:00 AM.

Today I believe the concrete trucks come back and they will pour the replacement driveway--which will have a "box" drain running across the entry--and probably the retaining walls and the new driveway, all while continuing work on the frame. They started at 6:00 AM again, so a long day is ahead.

More later, with photos.