Wednesday, December 12, 2007

Is it ONLY Wednesday?!!!

Home sweet home at the Post Library! Reminded me of the days of yore when Kelly and Hannah were little. Whenever they were too sick to go to school, I'd fix up a bed in the backroom for them to hang out on.


This post will be more of a diary entry, just to record what we've been doing. It's probably boring for anyone else to read.

Yesterday before work, Dale and I went off to Garage Door Brokers to order our garage doors. It will take 3 weeks or so to get them, so we should have done this sooner. There was no electricity there either, but they were open for business anyway. Dale dropped me off at the library and went back to our house to survey the damage--lots of limbs down. Meanwhile, Mama got a call on our cell phone (we'd given it to her so we'd have a way to communicate with her when she's at her house overnight) from Life Line in St. Louis. Ruth had gone to the hospital at 2:00 Mon. afternoon, and Life Line hadn't been able to reach us. As soon as Dale found out, he called the hospital and talked to his mom. She has pneumonia and is very weak. He plans to go to St. Louis later in the week.

Dale has been spending his days at Columbia Traders deli (owned by Jeff Neal, our contractor on the house project) where he can use his laptop. The place has been hopping with students and others who had to have computer access. BTW, he was there when it was announced that MSSU and OCC were cancelling finals. He said students were jumping up and down and shouting with glee. Finals have never been cancelled before.

Speaking of Columbia Traders and Jeff, he and his employees there were up until 4:30 a.m. yesterday preparing 600 breakfasts for the Empire Distric Electric crews. He only got an hour's sleep before going back to deliver the meals. Empire ordered another 700 lunches for today, so no rest for the weary. I'm happy for Columbia Traders, though. Jeff had been disappointed with how things were going with the deli business, so this should have a HUGE impact.

We were shocked to find out that our construction crew was back at work yesterday! No electricity, terrible weather (cold and rainy all day), but there they were hard at it. They finished the roof and began insulating. We went over this morning and took a picture of them (see below). They're very nice guys, hard-working, and seem to be doing a good job.



Here's tree debris on top of the wood the guys are using are using for the garage. The foreman told us today that he would cut up the limbs and haul them off for us! He's the one who, with his son, went over to Mama's house on Monday, cut some branches, covered the hole in her roof. He said that was really tough, since the roof was a sheet of ice.

Monday, December 10, 2007

The Iceman Cometh

We had thunder, lightning, and freezing rain most of the night Saturday, so awoke to a mess on Sunday. No church services because there was no power there. My mom called a little before 8:00 to tell us she had no power but planned to wait it out to see if it came back. We were enjoying our hot coffee/tea, hot oat bran, and the Sunday paper. But before we finished, our electricity went out, too. We toughed it out most of the day. Stayed warm by doing chores around the house. As it began to get dark (and colder), Dale dropped me off at the Post Library and went to get Mama. She was needing electricity to use her nebulizer. We hung out in the Post Library for a few hours-- cooked supper, watched t.v. She wanted to go back home to spend the night, so Dale took her there. He went to Walmart to buy an air mattress (we discovered the one we brought didn't hold air), so we slept here at the Post Library over night.



This morning we were going to go shower at the Y, but didn't wake up until 8, so there wasn't enough time. I'm looking and feeling pretty skanky without my shower. Meanwhile, Dale had an emergency to attend to at Mama's house. Yesterday she had lots of big limbs down. One tore the power lines from her house, so they're lying in the yard. Another took down her phone line. But the most urgent situation was caused by a limb that came down on the roof, tore off the turbine vent, and left a gaping hole. Dale went off to get someone to secure the roof (actually, some of the workers from the job site at our house, so that worked out well). He also took some photos since we'll have to file with the insurance co. Looks like she won't have power there for some time. I guess we'll probably be camping out all week at Post. With another 24 hours or so of freezing rain, the prognosis looks pretty grim.

Dale just reported that the guys covered over the roof hole with roofing and boards, so at least it's keeping rain out. They also cut some of the limbs that were hanging low over the house.



Here's some photos. The really nasty-looking one of the trunk split into 3 sections is actually in her neighbor's yard (to the east). A good portion of the tree is now lying in her yard.









Friday, December 7, 2007

End of Week 2

Omigoodness! What a week. The guys worked 40+ hours Mon.-Thurs. so they're taking the day off. So that gave me (Leslie) my first opportunity to take photos during daylight without getting in their way. (It's very muddy out there, so now I have to clean mud off my shoes.) Things are looking good, overall. We had a bit of a crisis to deal with on Wed. night, when Jeff called to tell us that Lowe's (yes, good ol' Screw-It-Up Lowe's) had messed up our materials order. Jeff had ordered a certain kind of the cement panels for the exterior walls of the garage, but Lowe's gave them the wrong ones. The work crew didn't know what had been ordered, so they just installed what they were given. Jeff stopped by to take a look at the progress and was horrified to see that it was NOT what we'd ordered. He sheepishly called us Wed. night to tell us the bad news and ask what we wanted to do. Since I was in the throes (literally) of preparing for a colonoscopy early Thurs. morning, it was NOT a good time to deal with it. We went out and looked at it with a flashlight. I didn't like it, but decided that since it's going to be hidden with trellises on the 2 sides that are visible, then it's not worth making them do it over. Obviously Lowe's wouldn't take it back anyway, since it had been cut and nailed up. The other 2 sides face the alley and the garage apartment, so I guess it doesn't matter. Jeff said he'd see if Lowe's would discount the materials any, and he would credit us for some labor and materials that were not used as a result of the screw up. (We had planned to do a board-and-batten design, which would have taken used more wood and labor). The front sidewalk is finished and is quite nice. Here are some photos.


The first one shows the garage as seen from the pond area. The side opening is where they'll put the original door from the basement garage.

As you can see, the flat roof slants to the alley. Once the pergola and trellis go up on this side, you won't be able to tell that it slants. You can get some idea of the incline of the new driveway. On either side are the footings for the new retaining walls that will be on either side of the driveway.

More footings for retaining walls


A view from the 2nd floor sunporch showing the partial roofing job.




Wednesday, December 5, 2007

Wed. p.s.

Dale didn't mention that I racked up some brownie points yesterday....literally. I baked a batch of brownies before I went to work and took them out to the work crew while they (the brownies) were still warm and gooey. So maybe that's why the sidewalk guy was willing to work over 13 hours for us yesterday. There had better not be cat tracks in our lovely new sidewalk. There's been a gray cat hanging around all day and night the last few weeks. In fact, I told one of the guys (who had a sledgehammer in his hand at the time), that if he had a little accident involving the sledgehammer and that cat, it would be our little secret.