Tuesday, January 22, 2008

Construction Project Completed

Though we don't have any pictures to post up tonight, our construction project is completed as of yesterday, Monday, January 21, 2008. Garage doors and openers were installed, and we now have one garage to park in overnight (the new one) and will be able to use the original one once we move stuff out. Finding where to put it will be the challenge. Maybe in the new garage? ;-)

We'll post pictures soon.

Saturday, January 19, 2008

Finally, A Door!

Finally, a couple of installers from Garage Door Brokers came by this morning and worked in 15 degree weather to get this much done on the door. The hardware is in place, and the opener is mounted, but the job is not finished yet. It is just too danged cold for them to finish today. Here's an up-close shot of the new door, followed by a shot from the corner of the yard, showing the whole garage. [Both photos enlargeable by clicking in them.]

The old garage wasn't framed right by the crew from Jeff's construction company, so they will be out Monday morning to adjust the framing according to specs. Monday morning the installers will return by 10 and complete the new garage installation, then do the door installation in the old garage. I had to take down the fluorescent light in the garage and install an outlet in the ceiling for the opener to be plugged in to.

So, we're getting close to finished, at least with the construction. Because of the cold weather, we haven't been able to return to painting. We can't wait for 2-3 days of 50 degree highs and 35 degree lows, so that we can get back at it. The new wood has to weather for several weeks before we can do anything to it.

Saturday, January 12, 2008

SATURDAY'S WORK

Today the weather was warm enough for us to get outside and do some things. Leslie overdid it, working to build a retaining wall of rocks along the alley side, as shown in this picture. That's a lot of hauling of big rocks, and her back took the brunt of it. But the results were worth it, don't you think? She also planted grasses and I think iris bulbs along there. [Clicking on each picture enlarges it.]
Meanwhile, I removed the original door handle & lock & installed a deadbolt lock on the sunporch door. This will allow me to park the truck in the garage and come in the back door. I still need to install a replacement door knob and lock set, but I have the set ready to be put on.

This next picture shows another thing I did: paint the strip over the garage door on the north side of the garage. This gives you an idea of what the walls will look like.
I thought I would show the interior of the new garage, with the lights I installed last Saturday.
Following is another picture of the garage interior, taken from the corner you see above. This one shows the recycled old garage doors. They will do nicely.
The Missouri Southern semester starts Monday, so I am afraid I will get to work on the garage only on Saturdays from now on. I have taken one of Art Saltzman's classes as an overload, a class I have never taught, so the semester will be rough again. Art died on Tuesday, January 8, of a brain aneurysm. What a shock.

Boil Order

We've experienced something the last few days that we've never had to do. Everyone 1 block west of Range Line to the state line and north of 50th st. to Airport Drive are under a boil order. We have to boil our water for 5 min. before we can drink it or cook with it. No big deal--that's easy enough to do. But the restaurants are being challenged. The water company says it will be at least Tues. before the water is safe. The order went into effect last Wed.

Today we're going to do some work on the mess left behind after the construction team left. Also need to clear out the old garage so we will have room to park the HOnda there if we ever get doors on the garages.

Have a great weekend, everyone!