Saturday, July 19, 2008

Puzzle Complete, and Great Movie

Following are two pictures of today's work. We made our third trip to Seneca , to M&M Stone, and loaded one pallet of mossy flagstone into the bed of our truck ourselves, then unloaded and laid the stones at home. This was the 5th pallet, the first 4 of which were delivered on Tuesday. We spent the rest of the week laying stones, Leslie in the early morning and after supper, me during the day. I will need to make one more trip to M&M for pea gravel, unless some place in Joplin sells it in the size we want. It will fill all the spaces and be swept and sprayed with water to settle it, and then we will be done...we hope. The picture above is from the north end, by the retaining walls. The picture below is from the garage looking to the back steps.
What a week! What a backyard project, including painting the trim, and soon the lattice & pergola. We might be ready for a backyard cookout by week's end.

Forgot to mention in yesterday's post: last night Leslie & I rented and watched Lars and the Real Girl, a wonderful, quirky movie that we will never forget. Everyone reading this post needs to see it.

Friday, July 18, 2008

Jigsaw Stone Work

Today I (Dale) took over the stone-laying project after Leslie went to work. She has been getting up at 5:30 each morning this week, eating an early breakfast, then going outside at 6:00 and working two hours laying stones. Because she's not strong enough to handle the largest stones, she has been laying only those she could carry. It's hard work. So today I said I would tote the largest ones and put them in place where they were needed. In doing so I completed the area surrounding the fountain. By "completed" I mean only laying the stone; I will need to find the smaller stones to fill in the larger gaps. Here are a couple of photos of the area:
Click within the pictures to enlarge them.
There is another area equally as large as the fountain area that now needs to be laid. I will be hauling the stones up to the area this afternoon. To do so requires a wheelbarrow and good legs to make it up the sloped driveway. It's sort of like working the blocking sled in football practice, you have to use your legs so much. But it's all good exercise.

I hope to have pictures of the completed area by day's end tomorrow.

Wednesday, July 16, 2008

We're too old for this!

[Note: We'll have enough of the flat stones that I can use them to construct a nicer retaining wall around the terrace.]

Here's some of what we've been doing this week. Yesterday we had about 3 1/2 tons of stone delivered. Last night after dinner (while Dale was at a meeting), I laid stones until 9:15. Today I got up at 5:30, laid stones for 2 hours, then cleaned up and rode my bicycle to work. Dale considers this my project--he's busy painting the garage. (Notice the lattice panel laid out on the ground so he can paint the wall behind it.) He did lay the stones in the lower area outside the garage doors, as shown in the bottom photo. But he had the hardest job--loading stones into the wheelbarrow and pushing them up the driveway to where they needed to be. The dump truck just dumped them in the street on the north side of our house, so moving them to where I can use them is back-breaking work. We're both very tired and sore, especially Dale, who put in a 12-hour hard-labor day (minus a couple of breaks). But we're determined to get this done quickly. Hannah is coming home the weekend of the 25th--we want to have all the stones laid so she can admire our handiwork!

Saturday, July 12, 2008

Grueling but gratifying

We overdid it again, but things are really taking shape. We got an early start, getting up soon after 6 a.m. to try to work before it got too hot. Yesterday Dale went to Yard Shack south of town and got a load of finely crushed limestone and spread it out. We needed another load, so we went back to Yard Shack this morning. But first we headed on down to Seneca to M&M Stone, picked out our paving stone & paid for it. We got 4 pallets of mossy ledge stone. They'll deliver it on Tuesday. Then we went back to Yard Shack for another load of the powdered limestone. We spent the rest of the day working extremely hard, as you can see by the pictures below.

This is part of what I did. I laid down a layer of the limestone, then moved all the concrete pavers around the oval iris bed I created. I put more of the limestone in the gaps between the pavers. Looks pretty cool, if I do say so myself.

Dale concentrated his efforts on the depression outside the garage door. He had to dig down several inches because of the sweep of the garage door. He knew that by the time we added the crushed stone base and the depth of the stones, the doors wouldn't open over it. So once again he had the back-breaking task of digging out roots and rocks and leveling the area. As a result, we'll have a slight. terraced effect. In the background, you can see another job I worked on today--creating a little stone retaining wall around the built-up area. Then we spread the rest of the crushed stone. We have a few days to recover before we start the massive jigsaw puzzle of laying all those big stones. I made Dale wear a back brace today--I wore one, too. I think that helped a lot. We're exhausted, but not in agony like we would be without the protection.