Monday, December 31, 2007

Basic Framing Monday

Today the crew began the framing for the back door deck/stairs and the pergola. Early on this morning one of the crew sledgehammered the old porch & steps with blows that made the house shudder. But it was all cleanly removed, as you can see in the first photo. Deck & steps will come out to the corner pillar. (All photos are enlargeable.)

The following photo shows the front framing for the pergola, including 3 of the brackets at the right corner:
Here is a detail of the corner:
One more shot, this time of the west side of the garage:
More Wednesday!

Sunday, December 30, 2007

A Day of Rest?

This afternoon, Sunday, after lunch, we got to work on cleaning up our back yard, where the most limbs had fallen around the tree near the pond. Some of the limbs were 6" thick and more. We spent 2 1/2 hours out there cutting them up and dragging them to the curb. Leslie used the loppers out front, to where I dragged the limbs from the back yard. I used the hand saw to cut up the biggest branches.

Cleaning up the mess revealed a tragic scene in the pond, which we had not been able to get to for nearly 3 weeks. Dead goldfish were floating on the surface. In all, 7 were scooped out dead, including the biggest one we had had for a few years. Leslie rescued one goldfish. There were 10-11 in the pond before, so we don't know what happened to the other 2-3. Maybe they will float up later.

The cleanup spread to the back yard, where we removed the remaining shrub close to the house, and Leslie pulled all the vines off the stone foundation.

The workers are going to be impressed tomorrow morning. We are, but we are also very tired. We are going to take it easy tonight.

Saturday, December 29, 2007

Set in Concrete

Today, Saturday, all the concrete is poured and curing. The concrete for the two driveways, plus the sidewalk fill-in, was poured the past three days. The driveway for the new garage was poured on Wedmesday, spent the night under plastic cover, then spent the night Thursday under hay. Even though it was below freezing those nights, the first night after pouring the concrete is warm enough (60 degrees) that it doesn't need to be insulated. The second night the workers put hay over the concrete to keep the water in it from freezing.

The old driveway replacement and the sidewalk sections were poured on Friday. Sometime between 7 and 8 Friday night, the two guys working on smoothing the old driveway went home, after coming in at 6 in the morning. Today they came back sometime and put hay over it. The following photos show the state of the project as of this morning early:























We can't wait for the driveways to cure so that we can drive a car up (or down) one. Of course, we will have to clean out the original garage before we can park the Honda there. But that's the plan. No more ice & snow scraping!

Friday, December 28, 2007

Exciting new photos



Our team has been working long days in horrible conditions, and here are the results as of mid-day. Notice that one of the arbor posts is up on the front left side of the garage. [Try clicking on the individual photos for enlargements.]